MA DOT Commonwealth Avenue Bridge Replacement Utility Relocation, Summer Roadway & Railroad Shutdown Project

16-025_August-13-2017 (3).JPG

For three weeks in August 2017 United Civil worked around the clock with Walsh Construction to relocate utilities for the high profile Commonwealth Avenue Bridge Replacement Project. 

16-025_August-13-2017 (2).JPG

Our scope of work included the installation of multiple utility crossings beneath MBTA Green Line tracks. Six crews alternated 12-hour shifts, seven days a week to meet the accelerated bridge replacement schedule. All while coordinating seamlessly with multiple contractors, we removed the existing track ballast, removed and replaced the MBTA electrical duct bank system, provided new conduit systems for Verizon, Eversource, Boston University Communications, City of Boston waterline, and Boston Traffic Control signal and street lighting.